Find link

language:

jump to random article

Find link is a tool written by Edward Betts.

searching for Alan Keef Ltd 16 found (27 total)

alternate case: alan Keef Ltd

Volk's Electric Railway (2,362 words) [view diff] exact match in snippet view article find links to article

actually constructed by Alan Keef Ltd. Built for Butterley Brick Co. Ltd. and operated at Star Lane Brickworks. Passed back to Alan Keef Ltd. after closure of
Great Laxey Mine Railway (1,210 words) [view diff] exact match in snippet view article find links to article
the train is in motion. Carriage 1, built by Alan Keef Ltd in 2004. Carriage 2, built by Alan Keef Ltd in 2007. The railway's freight wagons were originally
Blenheim Park Railway (561 words) [view diff] exact match in snippet view article find links to article
M. (2008). A Tale of Many Railways: An Autobiography and History of Alan Keef Ltd. Lightmoor Press. ISBN 978-1899889303. 51°50′20″N 1°21′02″W / 51.8389°N
Kerry Tramway (329 words) [view diff] exact match in snippet view article find links to article
Kerry Tramway Map of the Kerry Tramway Diana being restored at Alan Keef Ltd. in 1999 Overview Headquarters Kerry Locale Wales Dates of operation 1887–1925
Rainforest Ecological Train (435 words) [view diff] exact match in snippet view article find links to article
approximately 900,000 visitors yearly. The train was built in England by Alan Keef Ltd, in Ross-on-Wye. It is painted green and the propane-fired locomotive
Winson Engineering (500 words) [view diff] exact match in snippet view article find links to article
Timothy was unusable as delivered, and was subsequently rebuilt by Alan Keef Ltd in 2003. Six carriages for the Welsh Highland Railway Four carriages
Perrygrove Railway (565 words) [view diff] exact match in snippet view article find links to article
2-6-2T with a variation on Marshall valvegear Operational Midnight Blue Alan Keef Ltd Withdrawn for overhaul 2017. Re-entered service following overhaul August
Lyn (locomotive) (497 words) [view diff] exact match in snippet view article
be easier to maintain and operate. Final assembly was carried out by Alan Keef Ltd. who has had experience with other Baldwin locos, such as the restoration
Wales West Light Railway (348 words) [view diff] exact match in snippet view article find links to article
the mid 1960s. The two thousand pound locomotive was purchased from Alan Keef Ltd for use in the construction of the Wales West Light Railway. Gareth
Corris Railway (4,873 words) [view diff] exact match in snippet view article find links to article
Operational No 10 Alan Keef Ltd and Corris Railway 0-4-2ST 91 2022 Based on the original Hughes Locomotives Built by Alan Keef Ltd and members of the
Lartigue Monorail (1,859 words) [view diff] exact match in snippet view article find links to article
engines. The locomotive and its train of replica coaches were built by Alan Keef Ltd. By 1875 Lartigue had built a 90 km (56 mi) monorail to transport esparto
W. G. Bagnall (1,834 words) [view diff] exact match in snippet view article find links to article
from "Dart" from the Thomas The Tank Engine range. 0-4-0ST Woto at Alan Keef Ltd., 1999 0-4-2WT Olive, an 18 in (457 mm) gauge locomotive, at the Kimberley
Lynton and Barnstaple Railway (5,083 words) [view diff] exact match in snippet view article find links to article
completed in 2017. Its first public steaming took place on 8 July 2017 at Alan Keef Ltd. Lyn was delivered to Woody Bay on 11 September 2017, and first ran
Steam locomotives of the 21st century (2,763 words) [view diff] exact match in snippet view article find links to article
Stuart "Tattoo." Corris Railway Hughes Falcon Works 0-4-2ST, No. 10, by Alan Keef Ltd. based on the original Nos. 1, 2, and 3. Passed its steam test on September
Statfold Barn Railway (1,493 words) [view diff] exact match in snippet view article find links to article
M. (2008). A Tale of Many Railways: An Autobiography and History of Alan Keef Ltd. Lydney: Lightmoor Press. pp. 158–9, 178. ISBN 978-1-899889-30-3. Quine
Isle of Man Railway locomotives (8,391 words) [view diff] exact match in snippet view article find links to article
the boiler being sent away for repair in April 2018 and the frames to Alan Keef Ltd in October 2020. Long-time of the fleet and rarely out of service, the